TM• Built-In Direct Vent Fireplace• Natural Gas or Propane• Residential or Mobile HomeFeaturing theBurnerTested and Listed byOmni-Test Laboratories, I
10 Installation (for qualified installers only)Travis Industries 4040708 100-01160Hearth RequirementsThe hearth must tuck underneath this ledge.16” M
Installation (for qualified installers only) 11Travis Industries 4040708 100-01160Facing RequirementsNOTE: The combustible area above the facing must
12 Installation (for qualified installers only)Travis Industries 4040708 100-01160Facing Detail3-3/4"35-1/4"26-3/4"6-3/4"21-1/2&q
Installation (for qualified installers only) 13Travis Industries 4040708 100-01160Face DimensionsRectangular Bevel Face (Black or Gold)Access Door38”
14 Installation (for qualified installers only)Travis Industries 4040708 100-01160Facing and Hearth ExamplesFireplaceFace3/8" Thick Tile1/2"
Installation (for qualified installers only) 15Travis Industries 4040708 100-01160Facing and Hearth Examples (continued)36 DV FireplaceFace3/8"
16 Installation (for qualified installers only)Travis Industries 4040708 100-01160Mantel Requirements• The combustible area above the facing must not
Installation (for qualified installers only) 17Travis Industries 4040708 100-01160Vent Requirements! The vent must maintain the required clearance t
18 Installation (for qualified installers only)Travis Industries 4040708 100-01160Vent Installation• In addition to the requirements below, follow th
Installation (for qualified installers only) 19Travis Industries 4040708 100-01160Approved Vent ConfigurationsRestrictor Position• A vent restrictor
2 IntroductionTravis Industries 4040708 100-01160IntroductionWe welcome you as a new owner of a Fireplace Xtrordinair gas fireplace. In purchasing a
20 Installation (for qualified installers only)Travis Industries 4040708 100-01160Vertical Terminations with 0, 2, or 4 45° Offsets using 6-5/8” Dia.
Installation (for qualified installers only) 21Travis Industries 4040708 100-01160Horizontal Terminations using 6-5/8” Diameter VentUse a single 90°e
22 Installation (for qualified installers only)Travis Industries 4040708 100-01160Vertical Terminations with Two or Three 90° Elbows Using 6-5/8” Di
Installation (for qualified installers only) 23Travis Industries 4040708 100-01160Horizontal Terminations using 8” Diameter VentThe termination must
24 Installation (for qualified installers only)Travis Industries 4040708 100-01160Termination Requirements (see the illustration below)A Minimum 9&qu
Installation (for qualified installers only) 25Travis Industries 4040708 100-01160Gas Line Requirements! The gas line must be installed in accordance
26 Installation (for qualified installers only)Travis Industries 4040708 100-01160Electrical Connection! Make sure the household breaker is shut off
Finalizing the Installation 27Travis Industries 4040708 100-011601 Remove the glass frame (and arch covers) following the directions below.Warning: Th
28 Finalizing the InstallationTravis Industries 4040708 100-01160Glass Frame Removal (continued) - Spring Pin InstallationThe spring pin can come loos
Finalizing the Installation 29Travis Industries 4040708 100-01160? If converting to propane or using the firebacks, do so now before installing the lo
Table of Contents 3Travis Industries 4040708 100-01160IntroductionIntroduction & Important Information...2Safety PrecautionsSafety Pr
30 Finalizing the InstallationTravis Industries 4040708 100-01160Step 2 Install the twigs and ember chunk (see the illustration below).Place the le
Finalizing the Installation 31Travis Industries 4040708 100-011604 Replace the glass frame (and arch covers when using arched faces - see page 27).5 I
32 Finalizing the InstallationTravis Industries 4040708 100-011608 Turn the flame adjust knob to its highest position - the flames should be approxima
Operation 33Travis Industries 4040708 100-01160Before You Begin! Read this entire manual before you use your new fireplace (especially the section &qu
34 OperationTravis Industries 4040708 100-01160Starting The Pilot FlameThe pilot flame is required to ignite the mainburners (it also plays a safety r
Operation 35Travis Industries 4040708 100-01160Starting the Fireplace for the First Time+ Burn the heater at a high setting with the blower off for an
36 OperationTravis Industries 4040708 100-01160Adjusting the Blower SpeedThe internal blower helps transferthe heat from the fireplace into theroom.
Maintenance 37Travis Industries 4040708 100-01160Maintaining Your Fireplace's Appearance! Fingerprints or other marks left on the optional gold s
38 MaintenanceTravis Industries 4040708 100-01160Troubleshooting TableProblem: Possible Cause: Don't Call for ServiceUntil You:Pilot Will Not Lig
Maintenance 39Travis Industries 4040708 100-01160How this Fireplace Works! This fireplace was designed with safety as the primary concern. Many of th
4 Safety PrecautionsTravis Industries 4040708 100-01160• IF YOU SMELL GAS:* Do not light any appliance* Extinguish any open flame* Do not touch a
40 MaintenanceTravis Industries 4040708 100-01160Wiring DiagramFireplace BlowerRheostat Junction BoxHot (black)Common (white)Ground (green)Blower Snap
Safety Label 41Travis Industries 4040708 100-01160The safety (listing) label is adhered to the base of the fireplace near the gas control valve. A co
42 Limited 7 Year WarrantyTravis Industries 4040708 100-01160To register your TRAVIS INDUSTRIES, INC. 7 Year Warranty, complete the enclosed Warranty
Optional Equipment (for qualified installers only) 43Travis Industries 4040708 100-01160LP Conversion InstructionsInstall the conversion kit prior to
44 Optional Equipment (for qualified installers only)Travis Industries 4040708 100-011603 Follow the directions below to replace the orifices.1/2&qu
Optional Equipment (for qualified installers only) 45Travis Industries 4040708 100-011605 Install the logs andembers.6 Replace glass andface.7 Remove
46 Optional Equipment (for qualified installers only)Travis Industries 4040708 100-01160POWER HEAT DUCT (part # 98500769)The optional heat duct allo
Optional Equipment (for qualified installers only) 47Travis Industries 4040708 100-01160• Attach the blower box to the framing or floorboards of the
48 Optional Equipment (for qualified installers only)Travis Industries 4040708 100-01160• Attach the starter ring to the fireplace following the di
Optional Equipment (for qualified installers only) 49Travis Industries 4040708 100-01160• Attach the grill (and wall adapter, if necessary).GrillWal
Safety Precautions 5Travis Industries 4040708 100-01160• Do not place clothing orother flammable items on ornear the heater. Becausethis heater can b
50 Optional Equipment (for qualified installers only)Travis Industries 4040708 100-01160• Follow the directions below to wire the blower box.Remove
Optional Equipment (for qualified installers only) 51Travis Industries 4040708 100-01160• Run the free wire from the rheostat junction box to the fi
52 IndexTravis Industries 4040708 100-01160Approved Vent Configurations...18Adjusting the Blower Speed...
6 Features and SpecificationsTravis Industries 4040708 100-01160Features:- Works During Power Outages (millivolt system)- High Efficiency- Optional Th
Installation (for qualified installers only) 7Travis Industries 4040708 100-01160Installation Warnings:! Failure to follow all of the requirements ma
8 Installation (for qualified installers only)Travis Industries 4040708 100-01160Fireplace Placement RequirementsMinimum Framing DimensionsA 1/2"
Installation (for qualified installers only) 9Travis Industries 4040708 100-01160Corner InstallationsA typical 45° installation uses the minimum fram
Commentaires sur ces manuels